Commitment to Safety and Quality

Latest News:

May 2012 Coming next spring
"WellSource" - Full Integrated System


  • November 24-25, 2010 November 24-25, 2010 Two day Orientation of field crews and field supervisors with the Digital Tracking System in Carbon, Alberta. The orientation was conducted to familiarize all personnel with the functions on programs used before and introduce new software for the upcoming operations.
  • March 12, 2011 March 12, 2011 Successful completion using the digital system for the First Winter Drilling Project 2010-11. Demob of all computers from the rigs. The Program Included digital data collection using the WM Field System for over 550 wells.
  • March 22, 2011 March 22, 2011 Successful Completion of theSecond Winter Drilling Project 2010-11. Demob of all personnel from the field. The program included full Field Supervision and the full WM Digital System for over 600 wells.
  • May 2012 May 2012 Successful Completion of theSecond Winter Drilling Project 2010-11. Demob of all personnel from the field. The program included full Field Supervision and the full WM Digital System for over 600 wells.
  • July – Sep 2010 July – Sep 2010 Testing WM Digital System with Suncor.
  • September 2010 September 2010 Completing New WM Cost Control system.



     


 

Clients :: Engineering

Engineering


 

Grande Cache Coal Corporation:

2007
“By-passing Conveyor System-WME was involved in engineering, design and construction support for new conveyor system for Coal Preparation Plant.
"Bridge evaluation and assessment of pipes bridge over Smoky River” WME evaluated existing condition for Pipes Bridge

2008   
“SIZETEC-Intensive Dewatering System”
WME designs new dewatering system for Coal Preparation Plant.
“Conveyor #28 Bents Replacement”

Suncor Energy

2007
“Slurry Booster System Relocation” WME was involved in design and construction support for relocation and installation of existing Slurry Booster System.

2008
“FTPH Roof Assessment and Inspection-Phase 2 and 3” WME evaluated existing roof structure for Final Tailing Pump House-Scoping Study”

Black & Veatch Canada

2008

“EPCOR-Clover Bar Energy Centre, Units 2 and 3-Construction Support”
WME shall supply labor, services, resources and consultants to support construction of Clover Bar Energy Centre. WME shall assign professional engineer to perform task of field review in order to insure that construction will comply with Alberta Building Code. WME shall support Owner in effort to obtain building permit.

Surepoint Services Inc.

2008
”C-Container Prototype-Structural Engineering and Design”

Precision Steel & Manufacturing Ltd.

2008
“Syncrude- Temporary Steel Support for Feeder

 

 


 